News Detail

ATLÉTICO DE MADRID: 96 PTFE MEMBRANE PANELS LIFTED

The last panel of the Wanda Metropolitano's roof has been installed. The PTFE roof consists of 96 panels which took exactly 4 months to install (from March to July). Take a look at this amazing time-lapse showing 83.000 m² of PTFE membrane taking shape. The stadium is expected to be inaugurated this September and we can't wait! Video © Atlético de Madrid

Back